Park System Master Plans
Entire Parks System:
- 01 PR Master Plan Cover Final (236K pdf)
- 02 Table of Contents Final (63K pdf)
- 03 Acknowledgments Final (80K pdf)
- 04 Executive Summary Final (1846K pdf)
- 05 Chapter Divider Pages Final (46K pdf)
- 06 Ch 1 Introduction Final (545K pdf)
- 06A Figure 1
- 07 Ch 2 Existing Facilities Final (654K pdf)
- 07A Figure 2
- 08 Ch 3 Needs Assessment Final (1684K pdf)
- 08A Figure 3
- 09 Ch 4 Design Guidelines Final (2175K pdf)
- 10 Ch 5 Recommendations Final (2181K pdf)
- 10A Figure 5
- 11 Ch 6 Implementation Final (1943K pdf)
- 12 Bibliography Final (69K pdf)
- 13 APPENDIX A Park and Facility Inventory Final (749K pdf)
- 14 APPENDIX B City Parks Final (1486K pdf)
- 15 APPENDIX C Estimated Costs for Priority Projects Final (757K pdf)
- 15A Table C-1 Cost Estimates for Priority I & II Projects Final (76K pdf)
Timber Linn Memorial Park:
- 01 Timber Linn Master Plan cover (178K pdf)
- 02 TL Table of Contents FINAL (57K pdf)
- 03 TL Acknowledgments FINAL (80K pdf)
- 04 TL SECTION 1 FINAL (1127K pdf)
- 05 TL SECTION 2 FINAL (550K pdf)
- 06 TL SECTION 3 FINAL (183K pdf)
- 07 TL APPENDIX A FINAL (1206K pdf)
Inserts:
- 05A Fig 2 1 OPTION 1 (771K pdf)
- 05B Fig 2 2 OPTION 2 (645K pdf)
- 05C Fig 2 3 OPTION 3 (753K pdf)
- 05D Fig 2 4 Master Plan Model
- 06A TL Phase 1 Cost Estimate FINAL (63K pdf)
- 06B TL Phase 2 Cost Estimate FINAL (64K pdf)
- 06C TL Phase 3 Cost Estimate FINAL (64K pdf)
- 07A TL Existing Conditions (364K pdf)
- 07B TL Location (431K pdf)
- 07C TL Site Soils (395K pdf)
- 07D TL Land Use (980K pdf)
- 07E TL Site Opps & Constraints (758K pdf)




