Skip to main content
Phases 2 and 3 are included in the Capital Improvement Program document

The Cox Creek Interceptor project will provide capacity to reduce existing overflows and to handle peak buildout flows during a 5-year design storm event. With new additional capacity, surcharging in upstream sewer lines will be significantly reduced with a goal of eliminating unpermitted overflows from the sewer system. Construction of these improvements will also allow for continued property development in the upstream sewer basin and will also facilitate development downstream east of Interstate 5 (I-5). 

This project will reduce long-term operations and maintenance costs through reduction in emergency responses and reduction in infiltrating groundwater that must be pumped and treated.

 

cox creek p2 const

Phase 2

Under construction

This project will replace approximately 1,400 feet of undersized pipe with new 24-inch and 30-inch sewer pipe. 

Total Cost: $5,200,000

Master Plan: Sanitary Sewer Master Plan
Plan Element: P8
Category: Wastewater
Classification: Interceptors/Collectors
Department: Public Works

cox creek phase 2

Phase 3

This project will replace approximately 2,400 feet of undersized pipe with new 24-inch sewer pipe and extend approximately 500 feet of 24-inch sewer pipe across I-5. 

Total Cost: $8,367,000 

Master Plan: Sanitary Sewer Master Plan
Plan Element: P10A, P10B, P11A
Category: Wastewater
Classification: Interceptors/Collectors
Department: Public Works

cox creek p3 map

 

Contact us

Engineering

 Contact form

 541-917-7676

 333 Broadalbin SW

Operations

 541-917-7600

 310 Waverly Dr NE

Back to Top